The Zone 1 Reservoir and Zone 2 Pumping Station is proposed to be located on the east side of Liberty Street North, Bowmanville approximately 700 metres north of Concession Road 3. The Zone 2 Pumping Station will connect to the existing 300 milimetre watermain running along Liberty Street, supplying water to the Zone 2 water pressure district.
The Liberty Street North Zone 1 Reservoir and Zone 2 Pumping Station Class Environmental Assessment (EA) Addendum is filing for study completion with the Ministry of Environment, Conservation and Park. Opportunity for public comment is available during the filing period from October 3 to November 7, 2022. The Environmental Study Addendum Report (ESR) documents the latest design parameters, background studies, field investigations, and recommendation of the revised reservoir and pumping station location at 3403 Liberty Street North.
Following the completion of the Class EA Addendum filing – Phase 3 of the Class EA Process, the project will proceed to the Phase 4 – Implementation, with design throughout 2022/2023 and construction to commence 2023.
Questions: Should you have any questions or comments, please contact
the following staff member from the Regional Municipality of Durham Works Department.
Tyler Wilson
Project Engineer
905-668-7711 or 1-800-372-1102 extension 3117